{"id":18713,"date":"2019-10-03T12:50:10","date_gmt":"2019-10-03T12:50:10","guid":{"rendered":"http:\/\/www.greytrix.com\/blogs\/sagex3\/?p=18713"},"modified":"2024-11-26T08:54:15","modified_gmt":"2024-11-26T08:54:15","slug":"machine-and-labor-cost-calculation-in-sage-x3","status":"publish","type":"post","link":"https:\/\/www.greytrix.com\/blogs\/sagex3\/2019\/10\/03\/machine-and-labor-cost-calculation-in-sage-x3\/","title":{"rendered":"Machine and Labor cost calculation in Sage X3"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p>In <a href=\"https:\/\/www.greytrix.com\/sage-x3-erp\/\">Sage X3<\/a>, we may come across a scenario where we need to calculate machine and labor time for the specific release quantity on basis of time, cost for machine and labor will be calculated.<\/p>\n\n\n\n<p><strong>Navigate to -&gt; Manufacturing -&gt; Technical Data -&gt; Standard Operation<\/strong><br><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"819\" height=\"509\" src=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Standard-Operation.jpg\" alt=\"Declaration\" class=\"wp-image-18709\" srcset=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Standard-Operation.jpg 819w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Standard-Operation-300x186.jpg 300w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Standard-Operation-768x477.jpg 768w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Standard-Operation-660x410.jpg 660w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption class=\"wp-element-caption\">Standard Operation<\/figcaption><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Here we have entered setup and run time for machine is\n2 &amp; 3 hours respectively.<\/li>\n\n\n\n<li>And we have entered setup and operational time for\nlabor is 2 &amp; 5 hours respectively.<\/li>\n\n\n\n<li>There is no impact of preparation, wait time\nand post operation time on cost calculation.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"819\" height=\"460\" src=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Routing-Management.jpg\" alt=\"Routing Management Decalration\" class=\"wp-image-18710\" srcset=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Routing-Management.jpg 819w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Routing-Management-300x168.jpg 300w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Routing-Management-768x431.jpg 768w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Routing-Management-660x371.jpg 660w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption class=\"wp-element-caption\">Routing Management<\/figcaption><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>We need to map standard operation in routing\nmanagement so that it can invoke the details (Work centers, operational\ntimings, etc) in routing management.<\/li>\n\n\n\n<li>Routing code is tagged with finished good\nproduct so it will be directly inherited in work order and calculation will be\nas per standard operation.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"844\" height=\"525\" src=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Machine-calculation.jpg\" alt=\"Machine calculation in hours\" class=\"wp-image-18711\" srcset=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Machine-calculation.jpg 844w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Machine-calculation-300x187.jpg 300w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Machine-calculation-768x478.jpg 768w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Machine-calculation-660x411.jpg 660w\" sizes=\"(max-width: 844px) 100vw, 844px\" \/><figcaption class=\"wp-element-caption\">Machine calculation<\/figcaption><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Now for a completed work order for release\nquantity 6, calculation will be as follows.<\/li>\n\n\n\n<li><strong>Machine<\/strong>:<\/li>\n<\/ul>\n\n\n\n<p><strong>Declaration in standard\noperation<\/strong><\/p>\n\n\n\n<p><strong>Setup Time:<\/strong> 2\nHours<\/p>\n\n\n\n<p><strong>Run Time:<\/strong> 3 hours\n\/ UN<\/p>\n\n\n\n<p><strong>Calculation for work\norder<\/strong><\/p>\n\n\n\n<p><strong>Setup Time:<\/strong> 2\nhours<\/p>\n\n\n\n<p><strong>Run Time:<\/strong>&nbsp; 3 Hours \/ UN * 6(release Quantity) = 18 Hours\n(Total for work Order)<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"832\" height=\"504\" src=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Labor-calculation.jpg\" alt=\"Labor operational time calculation\" class=\"wp-image-18712\" srcset=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Labor-calculation.jpg 832w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Labor-calculation-300x182.jpg 300w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Labor-calculation-768x465.jpg 768w, https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2019\/10\/Labor-calculation-660x400.jpg 660w\" sizes=\"(max-width: 832px) 100vw, 832px\" \/><figcaption class=\"wp-element-caption\">Labor operational calculation<\/figcaption><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Labour:<\/strong><\/li>\n<\/ul>\n\n\n\n<p><strong>Setup Time:<\/strong> 2\nHours<\/p>\n\n\n\n<p><strong>Operation Time:<\/strong> 5\nhours \/ UN<\/p>\n\n\n\n<p><strong>Calculation for work\norder<\/strong><\/p>\n\n\n\n<p><strong>Setup Time:<\/strong> <\/p>\n\n\n\n<p>2 hours (Machine Setup Time) * 3 hours (labour Setup Time) = 6 Hours<\/p>\n\n\n\n<p><strong>Operational Time:<\/strong>\n<\/p>\n\n\n\n<p>&nbsp;3 Hours (Machine Run\nTime) * 6 (release Quantity) * 5 Hours (Operational Time) = 90 Hours (Total for\nwork Order)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>On basis of calculated time, final cost will be\ncalculated.<\/li>\n<\/ul>\n\n\n","protected":false},"excerpt":{"rendered":"<p>In Sage X3, we may come across a scenario where we need to calculate machine and labor time for the specific release quantity on basis of time, cost for machine and labor will be calculated. Navigate to -&gt; Manufacturing -&gt; Technical Data -&gt; Standard Operation Declaration in standard operation Setup Time: 2 Hours Run Time:\u2026 <span class=\"read-more\"><a href=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/2019\/10\/03\/machine-and-labor-cost-calculation-in-sage-x3\/\">Read More &raquo;<\/a><\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[919,2860,2825,1822,1848],"class_list":["post-18713","post","type-post","status-publish","format-standard","hentry","category-sage-x3-consulting","tag-greytrix-africa","tag-machine-calculation","tag-sage-erp-africa","tag-sage-x3","tag-sage-x3-consulting"],"_links":{"self":[{"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/posts\/18713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/comments?post=18713"}],"version-history":[{"count":9,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/posts\/18713\/revisions"}],"predecessor-version":[{"id":30238,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/posts\/18713\/revisions\/30238"}],"wp:attachment":[{"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/media?parent=18713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/categories?post=18713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/tags?post=18713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}