{"id":21643,"date":"2021-01-22T07:37:10","date_gmt":"2021-01-22T07:37:10","guid":{"rendered":"http:\/\/www.greytrix.com\/blogs\/sagex3\/?p=21643"},"modified":"2021-01-22T07:49:02","modified_gmt":"2021-01-22T07:49:02","slug":"rejection-label-in-sage-x3","status":"publish","type":"post","link":"https:\/\/www.greytrix.com\/blogs\/sagex3\/2021\/01\/22\/rejection-label-in-sage-x3\/","title":{"rendered":"Rejection Label in Sage X3"},"content":{"rendered":"\n<p><a href=\"https:\/\/www.greytrix.com\/product\/erp-development\/sage-x3\" data-type=\"URL\" data-id=\"https:\/\/www.greytrix.com\/product\/erp-development\/sage-x3\" target=\"_blank\" rel=\"noreferrer noopener\">Sage X3 <\/a>provides us a Quality Control module that is used to carry out the quality control and confirm the Product availability to place inventory into the stock.<\/p>\n\n\n\n<p>Once the product received in the receipt from the Supplier then the creation of Receipt entry and according to configuration process product must pass through quality control for quality verification purpose and accordingly stock identified by status. (Refer below identification code for product status)<\/p>\n\n\n\n<p>\u201cA\u201c that indicates acceptance status for the product<br>\u201cQ\u201c indicates pending validation status for the product<br>\u201cR\u201c indicates the Rejection status for the product<\/p>\n\n\n\n<p>In this blog, we will discuss about Rejection label generation process for those products which got rejected from the Quality control module.<\/p>\n\n\n\n<p>Let\u2019s understand the process with a single example.<\/p>\n\n\n\n<p>According to setup once the user creates a Receipt entry from the PO then the Analysis request gets created automatically. (Refer below screenshot for more Clarification)<\/p>\n\n\n\n<center><a href=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2021\/01\/IMG1.png\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" class=\"size-full\" style=\"border: 1px solid #A9A9A9; padding: 2px; margin: 2px; align: center;\" src=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2021\/01\/IMG1.png\" alt=\"Quality Control Entry\"><\/a><\/center>\n<font size=\"2\"><center>Quality Control Entry<\/center><\/font>\n\n\n\n<p>If you can see above the Quality control screen, the Analysis request was successfully created based on the Purchase Receipt entry also we have highlighted the same Receipt number with blue Border and the Analysis request with Red Border.<\/p>\n\n\n\n<p>Now as per the current client current requirement the Rejection label will be print-based on the Qty present from Detail level, in case there will be 10 Qty present then 10 label will be print respectively for each Product.<\/p>\n\n\n\n<p>Below is the Rejection Label format as per requirement:<\/p>\n\n\n\n<center><a href=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2021\/01\/IMG2.png\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" class=\"size-full\" style=\"border: 1px solid #A9A9A9; padding: 2px; margin: 2px; align: center;\" src=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-content\/uploads\/2021\/01\/IMG2.png\" alt=\"Rejection Label - Output\"><\/a><\/center>\n<font size=\"2\"><center>Rejection Label &#8211; Output<\/center><\/font>\n\n\n\n<p>Here is some Fields mapping that we have used in the Rejection label.<\/p>\n\n\n\n<p>1. REJECTED: Hardcoded Text<\/p>\n\n\n\n<p>2. QC Ref No: Analysis Request No. from Quality Control screen<\/p>\n\n\n\n<p>3. Dt: Control end date from Quality Control<\/p>\n\n\n\n<p>4. Material Name: All \u2013Stock\u2014Quality Control \u2013Product Disc<\/p>\n\n\n\n<p>5. Batch No. : All \u2013Stock\u2014Quality Control \u2013Quality control Detail-Lot<\/p>\n\n\n\n<p>The purpose of this blog that users can print label-wise Products along with required details and easily keep tracking of rejected Inventories.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>About Us<\/strong><\/h2>\n\n\n\n<p>Greytrix \u2013 a globally recognized and one of the oldest Sage Development Partners is a one-stop solution provider for Sage ERP and Sage CRM organizational needs. Being acknowledged and rewarded for multi-man years of experience and expertise, we bring complete end-to-end assistance for your technical consultations, product customizations, data migration, system integrations, third-party add-on development, and implementation competence.<\/p>\n\n\n\n<p id=\"block-28013e99-0882-44c6-b705-7b16c85053b2\">Greytrix&nbsp;has some unique integration solutions developed for&nbsp;<a href=\"https:\/\/www.greytrix.com\/sage-crm\/\">Sage CRM<\/a>&nbsp;with Sage ERPs&nbsp;namely&nbsp;<a href=\"https:\/\/www.greytrix.com\/sage-x3-erp\/\">Sage X3<\/a>,&nbsp;<a href=\"https:\/\/www.greytrix.com\/sage-intacct\/\">Sage Intacct<\/a>,&nbsp;<a href=\"https:\/\/www.greytrix.com\/sage-100-erp\/\">Sage 100<\/a>,&nbsp;<a href=\"https:\/\/www.greytrix.com\/sage-500-erp\/\">Sage 500<\/a>,&nbsp;and&nbsp;<a href=\"https:\/\/www.greytrix.com\/sage-300-erp\/\">Sage 300<\/a>. We also offer best-in-class&nbsp;Sage ERP&nbsp;and&nbsp;Sage CRM&nbsp;customization and development services&nbsp;to&nbsp;Business&nbsp;Partners,&nbsp;End&nbsp;Users, and Sage PSG worldwide. Greytrix&nbsp;helps in&nbsp;the migration of Sage CRM from&nbsp;Salesforce | ACT! | SalesLogix | Goldmine | Sugar CRM | Maximizer. Our Sage CRM Product Suite includes&nbsp;addons like&nbsp;&nbsp;Greytrix Business Manager,&nbsp;Sage CRM Project Manager,&nbsp;Sage CRM Resource Planner,&nbsp;Sage CRM Contract Manager,&nbsp;Sage CRM Event Manager,&nbsp;Sage CRM Budget Planner,&nbsp;Gmail Integration,&nbsp;Sage CRM Mobile Service Signature,&nbsp;Sage CRM CTI Framework.<\/p>\n\n\n\n<p id=\"block-4bc42a09-fb13-4598-8137-ce5f7b91ce28\">Greytrix is a recognized&nbsp;Sage Champion Partner&nbsp;for GUMU&#x2122; Sage X3 \u2013 Sage CRM integration listed on&nbsp;<a href=\"https:\/\/www.sage.com\/marketplace\/asb_ListingDetail?listingId=a1h24000007PC3aAAG\" target=\"_blank\" rel=\"noreferrer noopener\">Sage Marketplace<\/a>&nbsp;and Sage CRM \u2013 Sage Intacct integration listed on&nbsp;<a href=\"https:\/\/marketplace.intacct.com\/MPListing?lid=a2D0H000007kiHyUAI\" target=\"_blank\" rel=\"noreferrer noopener\">Sage Intacct Marketplace<\/a>. The&nbsp;<a href=\"https:\/\/www.greytrix.com\/gumu\/\" target=\"_blank\" rel=\"noreferrer noopener\">GUMU&#x2122; Cloud framework<\/a>&nbsp;by Greytrix forms the backbone of cloud integrations that are managed in real-time for the processing and execution of application programs at the click of a button.<\/p>\n\n\n\n<p id=\"block-76376301-1c3e-4250-8a09-727595a606f0\">For more information on our integration solutions, please contact us at&nbsp;<a href=\"mailto:sage@greytrix.com\">sage@greytrix.com<\/a>. We will be glad to assist you.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sage X3 provides us a Quality Control module that is used to carry out the quality control and confirm the Product availability to place inventory into the stock. Once the product received in the receipt from the Supplier then the creation of Receipt entry and according to configuration process product must pass through quality control\u2026 <span class=\"read-more\"><a href=\"https:\/\/www.greytrix.com\/blogs\/sagex3\/2021\/01\/22\/rejection-label-in-sage-x3\/\">Read More &raquo;<\/a><\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[3207,3210,1588,3209,3208],"class_list":["post-21643","post","type-post","status-publish","format-standard","hentry","category-sage-erp-x3","tag-label","tag-product-details","tag-quality-control","tag-rejected-inventories","tag-rejected-product"],"_links":{"self":[{"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/posts\/21643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/comments?post=21643"}],"version-history":[{"count":7,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/posts\/21643\/revisions"}],"predecessor-version":[{"id":21655,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/posts\/21643\/revisions\/21655"}],"wp:attachment":[{"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/media?parent=21643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/categories?post=21643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.greytrix.com\/blogs\/sagex3\/wp-json\/wp\/v2\/tags?post=21643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}